Express car wash development, from raw land to doors open
We develop express conveyor car washes start to finish. Site selection, feasibility, design coordination, construction oversight, equipment commissioning, and grand opening.

What you get
- 18,000+ AADT minimum threshold. We won't underwrite sites below operating viability.
- 8-variable site scorecard. Applied to every site before capital commits.
- A 5-year pro forma built from operating data, not the broker's numbers.
- Full project quarterback. From PSA through grand opening.
- Equipment package spec'd by operators. OPW/Belanger, Trident, ICS by default; alternatives where appropriate.
How we do it
Site identification and screening
We work from your acquisition criteria or source on-market and off-market sites in your target markets. Every candidate runs through our 8-variable scorecard before we ask for capital decisions.
Underwriting and pro forma
5-year DCF with sensitivity tables on revenue ramp, membership penetration, churn, opex, and capex. Stress-tested at -15% revenue, +20% opex. If the deal doesn't pencil at downside, we tell you.
Entitlement and design
Coordinate civil, architectural, and MEP design with engineers who've designed car washes before. Manage zoning, special use permits, and utility coordination.
Construction oversight
On-site through critical milestones. We catch problems in framing, not at the certificate of occupancy.
Equipment commissioning
A professional car wash installation team installs the OPW/Belanger tunnel, and electricians and plumbers make the electrical and plumbing connections. We coordinate the install. Commissioning covers Trident chemistry calibration, ICS configuration and crew training before doors open.
Grand opening and 90-day support
We stay through the ramp. Membership program tuning, ops issue resolution, marketing coordination.
Deliverables
- Site scorecard and selection memo
- Demographic and traffic analysis
- Competitive benchmarking
- 5-year pro forma with sensitivities
- Construction budget and schedule
- Equipment specification and procurement
- Crew training and operating procedures
- 90-day post-opening optimization plan
Does the traffic pencil? A rough check
0to100,000
0.3%to2.0%
$8to$25
- Cars per day
- Washes per year
- Annual revenue
Above the 18,000 AADT initial screen.
Illustrative only. Every figure here is your assumption, not a forecast. Membership mix, weather, competition and ramp time change the answer. Our underwriting uses a full 5-year pro forma.
Ask us to underwrite a real siteAADT × capture rate = cars per day; × 360 operating days × average ticket = annual revenue